Unclassified

IntegrateWise Partner & Implementation Playbooks

Implementation Blueprints, Rollout Patterns, and Best Practices

Version: 1.0
Classification: Partner Confidential
Last Updated: January 2026


Table of Contents

  1. Partner Overview
  2. Implementation Blueprint
  3. Role Checklist
  4. Change Management
  5. Rollout Patterns
  6. Troubleshooting Guide
  7. Success Metrics
  8. Support Escalation

1. Partner Overview

1.1 Partner Program Tiers

TierRequirementsBenefits
ReferralSigned agreement15% commission
Silver3 implementations20% commission, co-marketing
Gold10 implementations + certification25% commission, priority support
Platinum25+ implementations + dedicated support30% commission, roadmap input

1.2 Partner Resources

ResourceAccess
Partner Portalpartners.integratewise.com
Documentationdocs.integratewise.com/partners
Trainingacademy.integratewise.com
Deal Registrationpartners.integratewise.com/deals
Supportpartners@integratewise.com
Slack Channel#integratewise-partners

1.3 Partner Certification

┌─────────────────────────────────────────────────────────────────────────────┐
│                      PARTNER CERTIFICATION PATH                              │
└─────────────────────────────────────────────────────────────────────────────┘

     FOUNDATIONS              PRACTITIONER              EXPERT
     ───────────              ────────────              ──────

     ┌─────────────┐         ┌─────────────┐         ┌─────────────┐
     │  Platform   │────────▶│ Integration │────────▶│  Advanced   │
     │  Essentials │         │  Specialist │         │  Architect  │
     └─────────────┘         └─────────────┘         └─────────────┘
           │                       │                       │
           ▼                       ▼                       ▼
     • 4 hours online        • 8 hours online        • 16 hours
     • Core concepts         • Integration deep      • Architecture
     • Basic setup             dive                  • Custom solutions
     • Exam (70% pass)       • API mastery           • Case studies
                             • Exam (75% pass)       • Exam (80% pass)

2. Implementation Blueprint

2.1 Standard Implementation Timeline

PhaseDurationActivities
DiscoveryWeek 1Requirements, current state, goals
DesignWeek 2Architecture, integrations, workflows
BuildWeek 3-4Configuration, integrations, customization
TestWeek 5UAT, data validation, training
DeployWeek 6Go-live, monitoring, handoff
OptimizeWeek 7-8Fine-tuning, adoption support

2.2 Implementation Phases

┌─────────────────────────────────────────────────────────────────────────────┐
│                      IMPLEMENTATION PHASES                                   │
└─────────────────────────────────────────────────────────────────────────────┘

     DISCOVER          DESIGN           BUILD           TEST           DEPLOY
     ────────          ──────           ─────           ────           ──────

     Week 1            Week 2           Week 3-4        Week 5         Week 6

     ┌─────────┐      ┌─────────┐      ┌─────────┐    ┌─────────┐    ┌─────────┐
     │Discovery│─────▶│Solution │─────▶│Configure│───▶│   UAT   │───▶│Go-Live  │
     │Workshop │      │Design   │      │& Build  │    │         │    │         │
     └─────────┘      └─────────┘      └─────────┘    └─────────┘    └─────────┘
          │                │                │              │              │
          ▼                ▼                ▼              ▼              ▼
     • Stakeholder    • Integration    • Org setup     • Data         • Training
       interviews       mapping       • Integrations    validation     complete
     • Current state  • Data model    • Automations   • User flows   • Support
       assessment     • User roles    • Templates     • Performance    handoff
     • Success        • Automation    • Health score  • Sign-off     • Monitoring
       criteria         design          config                         active

2.3 Discovery Workshop Agenda

## Discovery Workshop (4 hours)

### Session 1: Business Context (60 min)

- Company overview and growth plans
- Current customer success challenges
- Success metrics and KPIs
- Budget and timeline constraints

### Session 2: Current State (60 min)

- Existing tools and processes
- Data sources and quality
- Team structure and workflows
- Pain points and gaps

### Session 3: Future State (60 min)

- Desired outcomes
- Integration requirements
- Automation opportunities
- Reporting needs

### Session 4: Roadmap Planning (60 min)

- Phase priorities
- Quick wins identification
- Resource requirements
- Timeline agreement

### Deliverables

- Discovery findings document
- Recommended solution architecture
- Implementation timeline
- Statement of Work (SOW)

2.4 Technical Requirements Checklist

## Technical Requirements Checklist

### Infrastructure

- [ ] SSO provider (if applicable)
- [ ] Firewall/network access requirements
- [ ] Data residency requirements
- [ ] Security/compliance requirements

### Integrations

- [ ] CRM system and credentials
- [ ] Support system and credentials
- [ ] Communication tools
- [ ] Billing/subscription data access
- [ ] API rate limit considerations

### Data

- [ ] Historical data for import
- [ ] Data cleanup requirements
- [ ] Field mapping documentation
- [ ] Custom field definitions

### Users

- [ ] User list with roles
- [ ] Team/Hub structure
- [ ] Permission requirements
- [ ] Training schedule

3. Role Checklist

3.1 Implementation Roles

RoleResponsibilityTime Commitment
Executive SponsorSign-off, escalations2 hours total
Project ManagerTimeline, coordination4-6 hours/week
Technical LeadIntegrations, config8-10 hours/week
CS Team LeadWorkflows, adoption4-6 hours/week
IT/AdminSecurity, access2-4 hours/week
End Users (pilot)Testing, feedback2-4 hours/week

3.2 RACI Matrix

TaskPartnerCustomer PMCustomer TechCustomer CSIntegrateWise
Project planningA/RCIIC
Integration setupRIAIC
Data migrationRIAIC
Workflow configA/RCICC
User trainingA/RCIRC
UAT coordinationRACRC
Go-liveRACCC
Post-go-live supportRIIAC

Legend: R = Responsible, A = Accountable, C = Consulted, I = Informed

3.3 Stakeholder Communication Plan

AudienceFrequencyChannelContent
Executive SponsorWeeklyEmailStatus summary, risks
Project Team2x/weekStandupProgress, blockers
End UsersAs neededEmail/SlackUpdates, training
IT/SecurityWeeklyMeetingTechnical updates

4. Change Management

4.1 Change Management Framework

┌─────────────────────────────────────────────────────────────────────────────┐
│                      CHANGE MANAGEMENT FRAMEWORK                             │
└─────────────────────────────────────────────────────────────────────────────┘

     AWARENESS          DESIRE           KNOWLEDGE        ABILITY          REINFORCE
     ─────────          ──────           ─────────        ───────          ─────────

     ┌─────────┐       ┌─────────┐      ┌─────────┐     ┌─────────┐      ┌─────────┐
     │  Why    │──────▶│  Why    │─────▶│  How to │────▶│ Practice│─────▶│ Sustain │
     │  change │       │  me?    │      │  use?   │     │ & apply │      │ & grow  │
     └─────────┘       └─────────┘      └─────────┘     └─────────┘      └─────────┘
          │                 │                │               │                │
          ▼                 ▼                ▼               ▼                ▼
     • Executive        • Personal      • Training      • Hands-on      • Recognition
       comms              benefits        sessions        practice      • Metrics
     • Team meetings    • WIIFM         • Documentation • Support        review
     • Vision sharing   • Address       • Quick guides  • Coaching      • Feedback
                          concerns                                        loops

4.2 Communication Plan Template

## Change Communication Plan

### Pre-Launch (2 weeks before)

**Audience:** All affected users
**Channel:** Email from Executive Sponsor
**Message:**

- Why we're implementing IntegrateWise
- What's changing
- Timeline overview
- How to get help

### Launch Week

**Audience:** All users
**Channel:** Team meeting + email
**Message:**

- Go-live announcement
- Training schedule
- Support resources
- Quick start guide

### Post-Launch (weekly for 4 weeks)

**Audience:** All users
**Channel:** Email + Slack
**Message:**

- Tips and tricks
- Success stories
- Common questions
- Feature highlights

4.3 Resistance Management

Resistance TypeSymptomsMitigation
Lack of awareness"Why are we doing this?"Executive communication, vision sharing
Fear of change"This is too hard"Training, support, gradual rollout
Loss of control"My way was better"Involve in design, show benefits
Lack of trust"This won't work"Pilot success, testimonials
Overload"Too much at once"Phased rollout, prioritization

4.4 Training Plan

SessionDurationAudienceContent
Overview1 hourAll usersPlatform tour, key concepts
Daily Workflows2 hoursCS teamAccount management, health scores
Automations2 hoursPower usersCreating and managing automations
Admin Training3 hoursAdminsConfig, integrations, users
Advanced2 hoursChampionsAPI, custom workflows

5. Rollout Patterns

5.1 Rollout Strategies

StrategyBest ForRiskSpeed
Big BangSmall teams, simple setupHighFast
Pilot → ExpandMedium orgs, new processesMediumMedium
Phased by TeamLarge orgs, multiple teamsLowSlow
Phased by FeatureComplex implementationsLowMedium

5.2 Recommended: Pilot → Expand

┌─────────────────────────────────────────────────────────────────────────────┐
│                      PILOT → EXPAND ROLLOUT                                  │
└─────────────────────────────────────────────────────────────────────────────┘

     PILOT                EXPAND               OPTIMIZE
     ─────                ──────               ────────

     Week 1-4             Week 5-8             Week 9+

     ┌─────────────┐     ┌─────────────┐     ┌─────────────┐
     │ Pilot Team  │────▶│ All Teams   │────▶│ Advanced    │
     │ (5-10 users)│     │             │     │ Features    │
     └─────────────┘     └─────────────┘     └─────────────┘
           │                   │                   │
           ▼                   ▼                   ▼
     • Core features      • Full rollout      • Automations
     • Basic integrations • All integrations  • Custom reports
     • Learn & adjust     • Apply learnings   • AI features
     • Gather feedback    • Champions support • Optimization

5.3 Pilot Selection Criteria

CriteriaIdeal Pilot Team
Size5-10 users
AttitudeOpen to change, tech-savvy
InfluenceRespected by peers
Use CasesRepresentative of broader org
AvailabilityCan commit time for feedback

5.4 Go-Live Checklist

## Go-Live Checklist

### T-5 Days

- [ ] All integrations tested
- [ ] User accounts created
- [ ] Training completed
- [ ] Support channels established
- [ ] Rollback plan documented

### T-2 Days

- [ ] Final data sync verified
- [ ] Go/no-go meeting held
- [ ] Communication sent to users
- [ ] Support team briefed

### Go-Live Day

- [ ] Production deployment confirmed
- [ ] Health checks passing
- [ ] War room active (first 4 hours)
- [ ] User login verification
- [ ] First-hour monitoring complete

### T+1 Day

- [ ] Day 1 metrics reviewed
- [ ] Issues documented and tracked
- [ ] User feedback collected
- [ ] Success stories captured

### T+7 Days

- [ ] Week 1 adoption metrics
- [ ] Top issues addressed
- [ ] Additional training if needed
- [ ] Lessons learned document started

6. Troubleshooting Guide

6.1 Common Issues

Integration Issues

IssueSymptomsResolution
OAuth expiredSync failures, 401 errorsRe-authenticate integration
Rate limitedSporadic sync failuresReduce sync frequency
Field mappingMissing/wrong dataReview field mappings
Permission denied403 errorsCheck API scopes

Performance Issues

IssueSymptomsResolution
Slow dashboardLong load timesCheck browser console, clear cache
Sync delaysOld data showingCheck sync status, force sync
Report timeoutReports not generatingReduce date range, simplify filters

User Issues

IssueSymptomsResolution
Can't loginAuth errorsCheck SSO config, reset password
Missing dataEmpty viewsCheck permissions, filters
Wrong permissionsAccess deniedReview role assignment

6.2 Troubleshooting Flowchart

┌─────────────────────────────────────────────────────────────────────────────┐
│                      TROUBLESHOOTING FLOWCHART                               │
└─────────────────────────────────────────────────────────────────────────────┘

     User reports issue
            │
            ▼
     ┌──────────────┐     Yes    ┌──────────────┐
     │ Is it a known│───────────▶│ Apply known  │──────▶ Resolved
     │    issue?    │            │   fix        │
     └──────┬───────┘            └──────────────┘
            │ No
            ▼
     ┌──────────────┐     Yes    ┌──────────────┐
     │ Can reproduce│───────────▶│ Document     │
     │   locally?   │            │ steps        │
     └──────┬───────┘            └──────┬───────┘
            │ No                        │
            ▼                           ▼
     ┌──────────────┐            ┌──────────────┐
     │ Collect logs │            │ Check if     │
     │ and context  │            │ config issue │
     └──────┬───────┘            └──────┬───────┘
            │                           │
            ▼                           ▼
     ┌──────────────┐            ┌──────────────┐
     │  Escalate    │            │ Apply fix    │──────▶ Resolved
     │  to support  │            │ or escalate  │
     └──────────────┘            └──────────────┘

6.3 Log Collection

## Information to Collect for Support

### User Issue

- User email
- Browser and version
- Steps to reproduce
- Screenshot/video
- Time of occurrence

### Integration Issue

- Integration type (HubSpot, Slack, etc.)
- Error message (exact text)
- Sync log URL
- Time range affected

### API Issue

- Request ID (from response headers)
- Endpoint called
- Request payload (redact sensitive data)
- Response received
- API key used (last 4 characters only)

7. Success Metrics

7.1 Implementation Success Metrics

MetricTargetMeasurement
On-time delivery90%Milestones met on schedule
Budget adherence±10%Actual vs. planned hours
User adoption (Day 1)80%Users logged in
User adoption (Day 30)90%Weekly active users
Data quality95%Records synced correctly
Customer satisfaction4.5/5Post-implementation survey

7.2 Adoption Metrics

┌─────────────────────────────────────────────────────────────────────────────┐
│                      ADOPTION METRICS DASHBOARD                              │
└─────────────────────────────────────────────────────────────────────────────┘

     Week 1              Week 2              Week 4              Week 8
     ──────              ──────              ──────              ──────

     Login Rate          Active Usage        Feature Adoption    Value Realized

     Target: 80%         Target: 60%         Target: 50%         Target: 80%
     ████████████        ████████░░░░        █████░░░░░░░        ████████████
     Actual: 85% ✅      Actual: 65% ✅      Actual: 55% ✅      Actual: 82% ✅


     ADOPTION CURVE

     100% │                                              ●────────────●
          │                                    ●─────────●
     75%  │                          ●─────────●
          │                ●─────────●
     50%  │      ●─────────●
          │    ●
     25%  │  ●
          │●
     0%   └────────────────────────────────────────────────────────────────▶
          Day 1   Week 1   Week 2   Week 4   Week 8   Week 12  Ongoing

7.3 Value Metrics

MetricBaselineTargetTimeframe
Time to identify at-risk accounts5 days1 day30 days
Manual data entry10 hrs/week2 hrs/week60 days
Health score accuracyN/A85%90 days
Proactive outreach rate20%60%90 days
CSM efficiencyBaseline+30%90 days

7.4 Post-Implementation Review

## Post-Implementation Review Template

### Project Summary

- **Customer:** [Name]
- **Implementation Partner:** [Partner]
- **Go-Live Date:** [Date]
- **Project Duration:** [X weeks]

### Objectives vs. Outcomes

| Objective     | Target   | Actual   | Status |
| ------------- | -------- | -------- | ------ |
| [Objective 1] | [Target] | [Actual] | ✅/❌  |
| [Objective 2] | [Target] | [Actual] | ✅/❌  |

### What Went Well

- [Item 1]
- [Item 2]

### Lessons Learned

- [Lesson 1]
- [Lesson 2]

### Recommendations

- [Recommendation 1]
- [Recommendation 2]

### Customer Feedback

- CSAT Score: [X/5]
- NPS: [X]
- Testimonial: "[Quote]"

### Next Steps

- [ ] 30-day review scheduled
- [ ] Advanced features training
- [ ] Optimization opportunities identified

8. Support Escalation

8.1 Support Tiers

TierScopeResponse TimeChannel
Self-serviceDocs, FAQsImmediatedocs.integratewise.com
Partner L1Basic issues4 hoursPartner handles
IntegrateWise L2Complex issues8 hourssupport@integratewise.com
IntegrateWise L3Critical/bugs2 hoursEmergency line

8.2 Escalation Path

┌─────────────────────────────────────────────────────────────────────────────┐
│                      ESCALATION PATH                                         │
└─────────────────────────────────────────────────────────────────────────────┘

     USER                PARTNER              INTEGRATEWISE
     ────                ───────              ─────────────

     ┌─────────┐        ┌─────────┐         ┌─────────┐
     │  User   │───────▶│ Partner │────────▶│   L2    │
     │  Issue  │        │   L1    │         │ Support │
     └─────────┘        └────┬────┘         └────┬────┘
                             │                    │
                             │ Cannot resolve     │ Bug/Complex
                             │ in 4 hours         │
                             ▼                    ▼
                        ┌─────────┐         ┌─────────┐
                        │Escalate │         │   L3    │
                        │ to IW   │         │ (Eng)   │
                        │   L2    │         │         │
                        └─────────┘         └─────────┘

8.3 Escalation Criteria

SeverityCriteriaResponseResolution
P1 - CriticalProduction down, data loss30 min4 hours
P2 - HighMajor feature broken2 hours8 hours
P3 - MediumFeature impaired8 hours48 hours
P4 - LowMinor issue, question24 hours5 days

8.4 Escalation Template

## Support Escalation Request

### Issue Summary

- **Customer:** [Name]
- **Partner:** [Partner]
- **Severity:** P1 / P2 / P3 / P4
- **Issue:** [Brief description]

### Details

- **Affected Users:** [Number/List]
- **Start Time:** [Timestamp]
- **Impact:** [Business impact]

### Troubleshooting Done

1. [Step taken]
2. [Step taken]
3. [Step taken]

### Attachments

- [ ] Screenshots
- [ ] Error logs
- [ ] Request IDs

### Contact

- **Partner Contact:** [Name, email, phone]
- **Customer Contact:** [Name, email]

8.5 Emergency Contacts

TypeContactHours
Partner Supportpartners@integratewise.com9am-6pm IST
Technical Supportsupport@integratewise.com24/7
Emergency Line+91-XXX-XXX-XXXX24/7 (P1 only)
Partner Slack#integratewise-partnersBusiness hours

Appendix A: Templates

A.1 Statement of Work (SOW) Template

## Statement of Work

**Customer:** [Name]
**Partner:** [Partner Name]
**Date:** [Date]

### 1. Project Overview

[Brief description of the implementation]

### 2. Scope of Work

#### In Scope

- [Item 1]
- [Item 2]

#### Out of Scope

- [Item 1]
- [Item 2]

### 3. Deliverables

| Deliverable | Description   | Due Date |
| ----------- | ------------- | -------- |
| [D1]        | [Description] | [Date]   |
| [D2]        | [Description] | [Date]   |

### 4. Timeline

| Phase     | Duration | Start  | End    |
| --------- | -------- | ------ | ------ |
| Discovery | 1 week   | [Date] | [Date] |
| Build     | 2 weeks  | [Date] | [Date] |
| Test      | 1 week   | [Date] | [Date] |
| Deploy    | 1 week   | [Date] | [Date] |

### 5. Pricing

| Item      | Hours | Rate | Total    |
| --------- | ----- | ---- | -------- |
| [Item]    | [X]   | $[Y] | $[Z]     |
| **Total** |       |      | $[Total] |

### 6. Assumptions

- [Assumption 1]
- [Assumption 2]

### 7. Acceptance

Customer: **\*\*\*\***\_**\*\*\*\*** Date: **\_\_\_**
Partner: **\*\*\*\***\_**\*\*\*\*** Date: **\_\_\_**

A.2 Weekly Status Report Template

## Weekly Status Report

**Customer:** [Name]
**Week Ending:** [Date]
**Overall Status:** 🟢 On Track / 🟡 At Risk / 🔴 Off Track

### Accomplishments This Week

- [Accomplishment 1]
- [Accomplishment 2]

### Planned for Next Week

- [Task 1]
- [Task 2]

### Risks and Issues

| Risk/Issue | Impact       | Mitigation | Owner  |
| ---------- | ------------ | ---------- | ------ |
| [Risk 1]   | High/Med/Low | [Action]   | [Name] |

### Metrics

| Metric          | Target | Actual |
| --------------- | ------ | ------ |
| Tasks completed | X      | Y      |
| Issues resolved | X      | Y      |

### Action Items

| Action     | Owner  | Due Date | Status    |
| ---------- | ------ | -------- | --------- |
| [Action 1] | [Name] | [Date]   | Open/Done |

Appendix B: Integration Quick Guides

B.1 HubSpot Integration

## HubSpot Integration Quick Guide

### Prerequisites

- HubSpot account (Professional or Enterprise)
- Admin access to HubSpot
- IntegrateWise Admin role

### Setup Steps

1. Navigate to Settings → Integrations → HubSpot
2. Click "Connect HubSpot"
3. Log in to HubSpot and authorize
4. Select objects to sync (Contacts, Companies, Deals)
5. Configure field mappings
6. Enable sync and verify

### Troubleshooting

- **OAuth error:** Re-authenticate
- **Missing fields:** Check HubSpot permissions
- **Sync delays:** Check rate limits

B.2 Salesforce Integration

## Salesforce Integration Quick Guide

### Prerequisites

- Salesforce account (any edition with API access)
- Salesforce Admin access
- IntegrateWise Admin role

### Setup Steps

1. Navigate to Settings → Integrations → Salesforce
2. Click "Connect Salesforce"
3. Select environment (Production/Sandbox)
4. Authorize via OAuth
5. Configure object sync (Accounts, Contacts, Opportunities)
6. Set field mappings
7. Enable and test

### Troubleshooting

- **API limits:** Monitor usage in Salesforce
- **Custom fields:** Ensure API names match
- **Permission errors:** Check profile/permission set

B.3 Slack Integration

## Slack Integration Quick Guide

### Prerequisites

- Slack workspace (any plan)
- Slack Admin access
- IntegrateWise Admin role

### Setup Steps

1. Navigate to Settings → Integrations → Slack
2. Click "Connect Slack"
3. Authorize IntegrateWise app
4. Select default channel for notifications
5. Configure alert types and thresholds
6. Test notification

### Troubleshooting

- **Messages not appearing:** Check channel permissions
- **Bot not responding:** Reinstall app
- **Wrong channel:** Update default in settings

Appendix C: Health Score Configuration

C.1 Default Health Score Weights

ComponentWeightData Source
Engagement30%Product usage, logins
Support25%Tickets, CSAT
Billing25%Payment status, growth
Relationship20%Meetings, NPS

C.2 Custom Health Score Formula

// Example custom health score calculation
const calculateHealthScore = (account) => {
  const weights = {
    engagement: 0.3,
    support: 0.25,
    billing: 0.25,
    relationship: 0.2,
  };

  const scores = {
    engagement: calculateEngagementScore(account),
    support: calculateSupportScore(account),
    billing: calculateBillingScore(account),
    relationship: calculateRelationshipScore(account),
  };

  return Object.keys(weights).reduce((total, key) => {
    return total + scores[key] * weights[key];
  }, 0);
};

IntegrateWise Partner & Implementation Playbooks
Version 1.0 — January 2026

For partner inquiries: partners@integratewise.com