Unclassified
Glossary
Use these definitions when writing integrations, reviewing proposals, or debugging IntegrateWise behavior.
- Adaptive Spine: The canonical context and continuity network that owns operational truth.
- Active Context Bundle: The product-language name for the ContinuityBundle delivered to runtime.
- Approval Center: The user-facing governance surface for reviewing, approving, rejecting, delegating, and dispatching proposals.
- API Connector: Structured external system connectivity for REST, GraphQL, and gRPC.
- API Wrapper: A normalized capability adapter for non-standard or legacy external APIs.
- Approval Token: The minted evidence that a proposed consequential action passed governance.
- Canary Context: Use only if defined in tenant policy; otherwise do not conflate with canonical test data.
- Capability Fabric: The resolver that maps available adapter capabilities into actionable platform actions under policy.
- Common Connected Surface: The logical operational layer across independent connected systems. Logical, not a datastore.
- Compact Load: Not a canonical term; use Creamy, Delta, or Streaming Load.
- Config Version: The immutable monotonic identifier tied to a CompiledTenantConfig snapshot used for execution-plan pinning.
- Continuity Bridge: The separate contract that delivers the Active Context Bundle to runtime.
- Contract: A strict typed interface declaring required capability, inputs, and expected output format.
- Creamy Load: Deep initial hydration for historical continuity formation.
- Customer Zero: IntegrateWise internal operations using the full stack.
- Delta Load: Time-window polling ingestion that absorbs ongoing changes.
- ExecutionPlan: The immutable, approved, versioned plan describing exact steps, authority, evidence, impact, and rollback for a consequential action.
- Hermes: Execution coordinator only; receives authorized ExecutionPlans and dispatches runtime adapters.
- Integration Manager: Governs connection lifecycle, auth, MCP discovery, webhook termination, and transport health. Limited to ConnectionProviderRegistry.
- MCP Connector: Model Context Protocol path for dynamic tool, resource, and prompt exposure under governed interception.
- Memory Fabric: Tiered memory system covering Working Context, Candidate Memory, and Promoted Memory.
- OODA: Observe, Orient, Decide, Act. Internal operating model, not usually surfaced to users.
- Outcome Event: The completed execution result emitted after provider confirmation, sync, and promotion evaluation.
- Plan Builder: Creates immutable ExecutionPlans from proposals, capability contracts, and governance decisions.
- Pre-Proposal Gate: Authority, scope, and policy check before proposal execution.
- Post-Proposal Gate: Risk, evidence, confidence, and approval requirement check after proposal creation.
- Provider Registry: Directory of active, authenticated adapters with lifecycle state and health signatures.
- Promotion: The capability-aware, governance-aware decision to adopt resulting provider state as canonical Spine truth.
- Projection: A governed view assembled from Spine state for Workbench consumption.
- Runtime Adapter: Lowest-level transport or compute environment executing dispatched commands under sandbox and isolation boundaries.
- Secrets Provider: Resolves credentials just-in-time for adapter use.
- Spine: Short form for Adaptive Spine.
- Streaming Load: Continuous event-driven ingestion from webhook or queue sources.
- Sync Engine: Bidirectional reconciler between the State Substrate and external providers.
- Tenant Isolation: Hard partition boundary enforced programmatically at provider and query layers.
- Twin: Silent partner that prepares outputs, detects change, retrieves context, and proposes actions. Does not execute consequential actions independently.
- Universal Governance: The cross-phase authority boundary enforcing pre- and post-proposal checks.
- Workbench: The primary compositional operating hub by department or role.